BillingDone logo - AI invoice generator for contractors
Sign in
Excavation/Grading invoice template

Excavation/Grading invoice template

Earthwork is billed by volume and machine hours, and what happens to the spoil is a major cost. Build one below — prefilled excavation/grading services, payment terms, PDF download, and a public payment link.

Common items
Operator labor hourly
Hour · $125.00
Site grading
Project · $950.00
Trenching
Project · $650.00
Drainage swale
Project · $850.00
Dirt hauling
Project · $450.00
Equipment mobilization
Each · $350.00
Dump fee
Each · $175.00
Small grading package
Project · $1,800.00

How excavation/grading invoicing actually works

Cut and fill volumes, haul-off, and import of suitable material are the real numbers. A site that balances — where the cut fills the low ground — is a fundamentally cheaper job than one where thousands of cubic yards leave on trucks or arrive on them. Show volumes and haul separately so the customer can see which situation they are in.

Unknowns are the trade's defining risk: rock, groundwater, buried debris, unsuitable soils. Price them as unit rates in the contract and invoice actual quantities. And record the utility locate — every excavator's worst day starts with a line that was not marked.

What belongs on a excavation/grading invoice

Beyond the universals — your details, the customer's details, a unique invoice number, dates, totals and payment terms — these are the lines that matter in this trade.

Cut and fill volumes in cubic yards
With whether the site balanced or required haul-off or import.
Machine and operator time by equipment class
Excavator, dozer, skid steer, compactor — different rates.
Haul-off and import, with trucking
Loads, destination and tipping fees; or source and material for import.
Unforeseen conditions at contract unit rates
Rock, groundwater, buried debris, unsuitable soil — actual quantities against agreed rates.

Line items this template starts with

These are the prefilled starting values in the BillingDone excavation/grading template — a starting point to edit, not a survey of market rates. Set your own prices once and they save for next time.

ServiceUnitStarting price
Operator labor hourlyHour$125.00
Site gradingProject$950.00
TrenchingProject$650.00
Drainage swaleProject$850.00
Dirt haulingProject$450.00
Equipment mobilizationEach$350.00
Dump feeEach$175.00
Small grading packageProject$1,800.00

Getting paid as a excavation/grading

  • Mobilisation should be its own payment. Moving machines to site is a real cost before a bucket touches ground.
  • Invoice unforeseen-condition work as it is encountered and approved, never as an end-of-job surprise.
  • Record the utility locate reference on the paperwork. It is your evidence as much as it is a compliance step.

Example invoice wording: Completed grading work, moved material, and cleaned access area.

Excavation/Grading invoicing questions

What should a excavation/grading invoice include?

A excavation/grading invoice should include your business details, the customer's contact information, itemized services, materials or fees, taxes, payment terms, a due date, and a clear total due.

Can excavation and grading contractors send invoices from a phone?

Yes. BillingDone is designed for fast mobile invoice creation so you can create, send, and collect payment while you are still on site.

Can I save common services?

Yes. Start with the built-in Quick Add Invoice Library, then save custom services, prices, and descriptions for your own repeat work.

How is excavation work priced?

By volume in cubic yards for cut and fill, plus machine and operator time by equipment class, plus haul-off or import of material. Whether the site balances is often the largest single factor in the total.

How should unexpected rock or groundwater be billed?

At unit rates agreed in the contract, invoiced at the actual quantity encountered. Fixed-price earthwork either prices in a contingency the customer resents or leaves the contractor absorbing a cost nobody could see.

Excavation/Grading invoice generator

Built for excavation/grading pros. Tap a service, set price, send. No signup.

AI Tools

Powered by Lovable AI

AI Quick Create

e.g. "Invoice Mike for faucet repair $225 due Friday"

Bill to

Items

Pick from the Quick Add Library or use AI Quick Create to start.

Adjustments

Recurring schedule

Auto-generate this invoice on a schedule. Perfect for cleaners, lawn care, IT support, retainers.

Payments

Record cash, check, Zelle, Venmo, or any partial payment. The public invoice shows the remaining balance automatically.

Paid so far
$0.00

Job photos

Before/after photos reduce disputes and look professional on the PDF. 0/8

No photos yet. Add before/after shots, materials, or signed paperwork.

Summary

Subtotal
$0.00
Tax
$0.00
Total due
$0.00

Quick Add Library

Excavation/Grading
Labor
Services
Fees
Packages